5.A.
CC CONSENT
Meeting Date:
02/20/2007
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

Information

CAPTION

1.  North Alamo Water Supply: 
*Valverde Grove L36 (1423 ES/S 83)- Bore- Jonah L. Reynolds (3/4" meter installation)
* Approximately 1530' of Line Extension going East from Mile 21/2E and Mile 8N on the North side crossing Mile 3E - X Rd- Franklin Mercer (3/4" meter installation).
* Approximately 500' East of Raul Longoria on the North side of Alberta Rd - Bore- Gilbert Cantu (3/4" meter installation).
*Arco Iris Subd. #2 L40 (1426 ES/S Owassa) - Bore- Edna Prado- 3/4" meter installation
* Approximately 500' East of Mile 4W on the North side of Mile 14N - Bore- Atanacio Guerrero - 3/4" meter installation.
* Approximately 400' West of Alamo Rd on the South side of Ingle Rd - Bore- Michael Talamantes- 3/4" meter installation.
* Approximately 21' West of Whalen Rd on the North and South side of Alegro St - Bore- Buen Gusto Subd (offsite) 8" waterline w/16" casing.
* Approximately 33' West of Whalen Rd on the North and South side of Palo Blanco Dr - Bore- Buen Gusto Subd (offsite) 8" waterline w/16" casing.

2. David Vela:  install an irrigation line 360 ft on County Easement between Mile 15 and FM 493- 1/2 mile west of 493.

3. Vos Farms:  to  bore under Mile 12 North approximately 1210' East of Mile 6 (Westgate) into drainage ditch on South side of Mile 12.