Arturo Cobos d.b.a. COBOS CONSTRUCTION:
* Jack and Bore construction of an 8" PVC sanitary sewer (SDR 26) within Starshine Drive Right of Way and connect to an existing sanitary sewer manhole. Contractor will not disturb the existing asphalt paving.
North Alamo Water Supply:
* Approximately 150' North of Mile 11N on Old La Blanca Rd- Bore- Maiz Acres No.4 - 8" waterline w/16" casing.
* Approximately 655' North of Mile 11N on Old La Blanca Rd- Bore- Huisache Acres No. 8- 8" waterline w/ 16" casing.
* Approximately 500' West of Mile 4.5W on the North side of JP Garza St. North of Mile 10N - X Rd- Emiliano Saavedra - 3/4" meter installation.
* Approximately 500" West of Gwin Rd on the North side of Pinkston Rd - Bore- Nueva Era Construction- 3/4" meter installation.
Texas Gas Service Company:
* Permittee will be excavating within the south ROW line of Mile 11 for approximately 200 feet in length.
* Jack and Bore construction of an 8" PVC sanitary sewer (SDR 26) within Starshine Drive Right of Way and connect to an existing sanitary sewer manhole. Contractor will not disturb the existing asphalt paving.
North Alamo Water Supply:
* Approximately 150' North of Mile 11N on Old La Blanca Rd- Bore- Maiz Acres No.4 - 8" waterline w/16" casing.
* Approximately 655' North of Mile 11N on Old La Blanca Rd- Bore- Huisache Acres No. 8- 8" waterline w/ 16" casing.
* Approximately 500' West of Mile 4.5W on the North side of JP Garza St. North of Mile 10N - X Rd- Emiliano Saavedra - 3/4" meter installation.
* Approximately 500" West of Gwin Rd on the North side of Pinkston Rd - Bore- Nueva Era Construction- 3/4" meter installation.
Texas Gas Service Company:
* Permittee will be excavating within the south ROW line of Mile 11 for approximately 200 feet in length.