CAPTION

1. SBBI, INC.
This proposed construction will consist of removing an existing bridge crossing over the Hidalgo County I.D. No. 2 Lateral "A" concrete canal at the locations referenced below and placing that portion of the canal underground via a 72" or 60" RCP.

2. North Alamo Water Supply Corporation:
Approximately 1,158' going west from C/L of FM 491 and Mile 14 1/2N on the south side- Line Ext.- Abram Castaneda- 3/4" service connection.