CAPTION
-
North Alamo Water: Hargill (10th & Couch) - BORE- Marisa Davila (3/4" meter installation)
-
Quintanilla, Headley and Associates: The contractor will bore Doolittle Road to install two 8 inch Sanitary Sewer Lines for the proposed Santa Gloria Subdivision. The first bore will be 435.0 feet and the second 710.0 feet North of Mile 19 North Road.
-
Enterprise Texas Pipeline: 10" diameter pipeline approximately 8 feet South of the most northerly right of way line of seven mile line road for a distance of 85 feeet then turn south across said seven mile line road for approximately 72 feet in lenght till it exits the right of way of seven mile line road.
-
Southwestern Bell Telephone Co: Proposes to place buried cable within the right of way of Abram Rd; Proposes to place buried cable within the right of way of Mile 22 1/2 N Rd.
-
AT & T: Proposes to place buried cable within the right of way of Las Canas Dr & MIle 10 1/2 N.
-
Arturo Cobos DBA Cobos Construction: Open cut Sunshine Drive and connect to an existing sanitary sewer manhole. Contractor will saw cut a 3' wide trench. The trench will be backfilled, compacted to 98% standard density and overlayed with 2 inches of Type D, Hot Mix Asphaltic Concrete. See attached sketch.