AI- 32780
7.A.
CC CONSENT
- Meeting Date:
- 06/26/2012
- Submitted By:
- Rebecca Gomez, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. SDI Engineering LLC:
Proposed 6 inch waterline that will connect to a proposed 6" waterline at Ramos Lane. Said proposed 6" line will be bore 70 linear feet North and across Alberta Road and then turns East with an 8 inch waterline within an exclusive N.A.W.S.C. easement parallel to the North Right-of-Way line of Alberta Road.
2. Sharyland Water Supply:
A 12" PVC waterline to be encased within a 20" PVC casing crossing to be located approximately 87 ft. South of the intersection of Inspiration Rd. and FM 676.
Proposed 6 inch waterline that will connect to a proposed 6" waterline at Ramos Lane. Said proposed 6" line will be bore 70 linear feet North and across Alberta Road and then turns East with an 8 inch waterline within an exclusive N.A.W.S.C. easement parallel to the North Right-of-Way line of Alberta Road.
2. Sharyland Water Supply:
A 12" PVC waterline to be encased within a 20" PVC casing crossing to be located approximately 87 ft. South of the intersection of Inspiration Rd. and FM 676.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | mmunoz | 06/12/2012 09:41 AM |
| Auditor's Office | aduran | 06/21/2012 10:03 AM |
- Form Started By:
- Rebecca Gomez
- Started On:
- 06/12/2012 08:34 AM
- Final Approval Date:
- 06/21/2012