4.A.
CC CONSENT
- Meeting Date:
- 05/08/2007
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. North Alamo Water Supply:
* Alberta Subd L22 (Alberta SS/W Tower) - BORE- Santhosh Skariah (3/4" meter installation)
* Thelma St SS/E 1426 - BORE - Santana Torres (3/4" meter installation)
2. Cobos Construction:
* Open cutOwassa Road and install a 6” PVC Water line to connect an existing 6” NAWSC water line. Contractor will saw cut a 3 foot wide trench. The trench will be backfilled, compacted to 98% standard density and overlaid with 2 inches of Type D, Hot Mix Asphaltic Concrete, see attached sketch.
3. Crystal Gas Storage:
* Proposes to perform groundwater sampling of monitor wells to the west and southeast corner of FM 493 & a county road bordering the northern Former Adobe Refinery. Upon completion the wells will be plugged and abandoned in accordance with State regulations.
* Alberta Subd L22 (Alberta SS/W Tower) - BORE- Santhosh Skariah (3/4" meter installation)
* Thelma St SS/E 1426 - BORE - Santana Torres (3/4" meter installation)
2. Cobos Construction:
* Open cut
3. Crystal Gas Storage:
* Proposes to perform groundwater sampling of monitor wells to the west and southeast corner of FM 493 & a county road bordering the northern Former Adobe Refinery. Upon completion the wells will be plugged and abandoned in accordance with State regulations.