5.A.
CC CONSENT
- Meeting Date:
- 05/15/2007
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. Rio Delta Engineering:
* Road crossing (bore) an 8" PVC water line to be encased within a 12" PVC casing. Crossing to be located approximately 404.37 ft East of the intersection of Stewart and 7 1/2 Mile Road.
2. North Alamo Water Supply:
* Approximately 1/2 mile east of Tower Rd on the South side of Trenton Rd- Bore- Armando Castro (3/4" meter installation)
* Bar #2 L49 (Doolittle WS/N 1925) - BORE- Dora E. Ovalle (3/4' meter installation)
* Palmas #2 L24 (2128/Tower) - BORE- Olga Garza (3/4" meter installation)all are 2" water lines
* Approximately 1391' West of "I" Rd on the North side and South side of Owassa Rd - BORE- Rose Garden Apartment (8" waterline with 16" casing)
* Road crossing (bore) an 8" PVC water line to be encased within a 12" PVC casing. Crossing to be located approximately 404.37 ft East of the intersection of Stewart and 7 1/2 Mile Road.
2. North Alamo Water Supply:
* Approximately 1/2 mile east of Tower Rd on the South side of Trenton Rd- Bore- Armando Castro (3/4" meter installation)
* Bar #2 L49 (Doolittle WS/N 1925) - BORE- Dora E. Ovalle (3/4' meter installation)
* Palmas #2 L24 (2128/Tower) - BORE- Olga Garza (3/4" meter installation)all are 2" water lines
* Approximately 1391' West of "I" Rd on the North side and South side of Owassa Rd - BORE- Rose Garden Apartment (8" waterline with 16" casing)