CAPTION

North Alamo Water Supply Corp.:
1.  NAWSC is proposing an 8 inch waterline crossing on Sioux Road and located 1,660 LF east from the intersection of Raul Longoria.  The proposed 8 inch waterline crossing will be bored and encase with 16" x 3/8" x 35 LF of steel casing with total of 95 LF of pipe being installed within Sioux Road right of way.  Further the existing elevation on Sioux Road is 105.85 feet and the proposed steel casing will be installed at 100.85 feet being 5.0ft  below ground.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Alejandro Garcia 05/02/2013 08:02 AM
Auditor's Office Monica Salinas 05/03/2013 05:11 PM
Form Started By:
Rebecca Gomez
Started On:
05/01/2013 09:49 AM
Final Approval Date:
05/03/2013