4.A.
CC CONSENT
- Meeting Date:
- 05/29/2007
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
Information
CAPTION
1. Texas Gas Service Company:
* The excavation will take place on West ROW line of FM 1423. (Off-System Road Valley View Road,. See attached aerial view. Permittee will be excavating an 8' by 8' Bell Hole to do a 3-foot tie in where a 12" and 2" pipeline intersect.
2. North Alamo Water Supply:
* Approximately 500' going North from Mile 11N on the East side of Mile 4.5W - BORE- Victor Samudio; 2" water line; 3/4" meter installation.
* The excavation will take place on West ROW line of FM 1423. (Off-System Road Valley View Road,. See attached aerial view. Permittee will be excavating an 8' by 8' Bell Hole to do a 3-foot tie in where a 12" and 2" pipeline intersect.
2. North Alamo Water Supply:
* Approximately 500' going North from Mile 11N on the East side of Mile 4.5W - BORE- Victor Samudio; 2" water line; 3/4" meter installation.