Skip to main content

AgendaQuick™

View Agenda Item

AI- 5156
4.A.
CC CONSENT
Meeting Date:
08/28/2007
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

CAPTION

1.  RGV Horizon Developers, LTD:
*  install a 24" RCP Drain line alone Mile 5N Road and Taylor Road

2.  R. Gutierrez Engineering:
*  install a 24" RCP and 2-60" RCP crossing the ROW on Alberta Rd 2,880 feet East of Raul Longoria Rd (FM 1426)
*  install  2-36" RCP crossing the ROW on South "I" Rd 1,440 feet North of Military Hwy. (US 281)

3.  Texas Gas Service:
*  TGS has 10" West ROW line of Val Verde Road runs and is requesting authorization to do maintenance and or construction if necessary to repair any anomalies within the ROW of Val Verde Rd.   Please note that this is an existing gas line.

4.  Melden & Hunt:
*  install a 8" PVC C900 DR18 water line crossing Sioux Road Estates.
*  La Joya Water Supply is proposing the installation of 5,340 LF of 8" waterline along the west right of way line of Western Road on a 5.0 foot offset from Mile 4 North Road to MIle 5 North Road. 

5.  North Alamo Water Supply:
*  Approximately 500' North of Mile 10 on the East side of FM 493- BORE- Reynaldo Valdez-
 3/4' service connection.

6.  Pena Engineering:
*  Install a 8" water line out of Hector Cortez tract.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Dina Trevino 08/22/2007 05:07 PM
Auditor's Office lfong 08/24/2007 11:01 AM
Court Administrator Monica Salinas 08/24/2007 11:05 AM
Form Started By:
Saul Garcia
Started On:
08/20/2007 01:49 PM
Final Approval Date:
08/24/2007