Skip to main content

AgendaQuick™

View Agenda Item

5.A.
CC CONSENT
Meeting Date:
10/17/2006
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

Information

CAPTION

Permits:
1.  North Alamo Water Supply:   Approximately 500’ going east from the centerline of mile 6W and Mile 17 1/2N on the north side boring from south to north – BORE- Amy L. Rios- ¾” meter installation.

2.  Sharyland Water Supply:  Road Crossing (BORE)- A 1” waterline to be encased within a 2” PVC casing crossing to be located approximately 631 ft. East of the intersection of McColl Rd. and Schunior Rd.

3.  Salinas  Associates:  Doolittle Road & S.H. 107 (see attached drawing- sheet 1 of 1) by Salinas Engineering & Assoc. dated 2/08/06.

BACKGROUND


Fiscal Impact

Attachments