Skip to main content

AgendaQuick™

View Agenda Item

AI- 6994
5.A.
CC CONSENT
Meeting Date:
12/18/2007
Submitted For:
Joe Pena
Submitted By:
Sandra Garcia, RIGHT OF WAY DEPT.
Department:

Information

CAPTION

Garza & Garza Engineering:
1.  Install a 8" water line about 829.73' and a 8" sewer line about 779.73' South of N.E. corner Lot 126 Lott Town & Improvements Co. Subdivision, Donna, Hidalgo County, Texas.

La Joya Water Supply:
2.  The contractor will bore Circle 6 Street North two times and install a 2" PVC casing at a distance 900.0 ft and 1,200.0 ft west of Salida Del Sol Drive.  
3.  The contractor will bore Circle 6 Street South four times and install a 2" PVC casing at a distance 1,210.0 ft 1,350.00 ft 1,490.0 ft and 1,630.0ft east of Circle 6 Street West.

North Alamo Water Supply:
4.  Approximately 1000' south of Walker Rd on east and west side of Victoria Rd 
5.  Approximately 1090' south of Walker Rd on east and west side of Victoria Rd
6.  Approximately1190' south of Walker Rd on east and west side of Victoria Rd- BORE- La Victoria  Subd. Phase 1; 2" PVC casing w/ 1" waterline.
7.  Approximately 1280' south of Walker Rd on east and west side of Victoria Rd- BORE-
8.  Approximately 1350' south of Walker Rd on east and west side of Victoria Rd- BORE- La Victoria Subd. Phase 1; 2" PVC casing w/ 1" waterline.
9.  Approximately 910' south of Walker Rd on east and west side of Victoria Rd - BORE- La Victoria Subd. Phase 1; 6" waterline w/ 12" PVC casing.
10.  Approximately 1370' south of Walker Rd on west and east side of Victoria Rd- BORE- La Victoria Subd. Phase 1; 6" waterline w/ 12" PVC casing.
11.  Approximately 1334' east of Hwy 281 on north and south side of Owassa Rd- BORE- DM Roth Subd.; 8" waterline w/ 16" PVC casing.
12.  Capisallo Park L13 B4 (SEC 1E/ 9N)- BORE- Guadalupe Villalobos; 3/4" serv. connection

McAllen Public Utility:
13.  Install a 24" waterline along N. Ware Rd & Mile 6 Rd.

Izaguirre Engineering Group:
14.  Install a 8" waterline along Abram Rd.

Kyle Bennett:
15.  Install an 8" waterline along Midway Rd.

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Dina Trevino 12/13/2007 08:39 AM
Rey Salazar Rey Salazar 12/13/2007 09:07 AM
Auditor's Office aduran 12/14/2007 03:55 PM
Court Administrator Monica Salinas 12/14/2007 04:18 PM
Form Started By:
Saul Garcia
Started On:
12/11/2007 10:13 AM
Final Approval Date:
12/14/2007