AI - 81146
4.D.
DD-CONSENT AGENDA SPECIAL MTG
- Meeting Date:
- 06/15/2021
- Submitted For:
- Jaime Salazar
- Submitted By:
- Moises Salazar, DRAINAGE DISTRICT
- Department:
- DRAINAGE DISTRICT
Information
CAPTION
1. Ratification of the fully executed Change Order No. 5 reflecting seven (7) additional construction calendar days, in connection with Contract C-HCDD1-20-043-09-15-"Malone Drive & Pomelo Road -2018 Bond Referendum Project #18" with Venser Contractors, LLC, and as recommended by Project Engineer, Guzman & Munoz Engineering & Surveying, and approved by HCDD1 General Manager, Raul E. Sesin, P.E., CFM.
2. Ratification of the fully executed Change Order No. 6 reflecting ten (10) additional construction calendar days, in connection with Contract C-HCDD1-20-043-09-15-"Malone Drive & Pomelo Road -2018 Bond Referendum Project #18" with Venser Contractors, LLC, and as recommended by Project Engineer, Guzman & Munoz Engineering & Surveying, and approved by HCDD1 General Manager, Raul E. Sesin, P.E., CFM.
2. Ratification of the fully executed Change Order No. 6 reflecting ten (10) additional construction calendar days, in connection with Contract C-HCDD1-20-043-09-15-"Malone Drive & Pomelo Road -2018 Bond Referendum Project #18" with Venser Contractors, LLC, and as recommended by Project Engineer, Guzman & Munoz Engineering & Surveying, and approved by HCDD1 General Manager, Raul E. Sesin, P.E., CFM.
BACKGROUND
Compliance to HB1295 has been met.
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Final Approval | Nora Cavazos | 06/11/2021 04:42 PM |
- Form Started By:
- moysalazar
- Started On:
- 06/07/2021 03:34 PM
- Final Approval Date:
- 06/11/2021