Skip to main content

AgendaQuick™

View Agenda Item

AI- 82289
Planning Department   5.B.
CC CONSENT AGENDA SPECIAL MTG
Meeting Date:
09/07/2021
Submitted For:
Flor Castillo
Submitted By:
Flor Castillo, PLANNING DEPT.
Department:
PLANNING DEPT.

Information

CAPTION

1. PIPELINE AND UTILITY PERMITS
a. Applicant: North Alamo Water Supply Corporation
 Legal Description: 2.00 acres out of Lot 2006 North Capisallo District Subdivision (Mile 12 ½ North Road & Mile 2 West Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 16” waterline east of Mile 2 West Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 2 West Road.
 
b. Applicant: North Alamo Water Supply Corporation
 Legal Description: 10.00 acres out of Lot 13 Blk. 102  Turner Tract Subdivision (F.M. 491 & Mile 22 ½ North Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 1 1/2” waterline south of Mile 22 ½ North Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 22 ½ North Road.
 
c. Applicant: North Alamo Water Supply Corporation
 Legal Description: A portion of Lot 3 Blk. 57 Alamo Land & Sugar Co. Subdivisiono Proposed; Suncrest Acres Subdivision
(Tower Road & Canton Road) (Pct. 4)
 Location of Pipeline or Utilities: Existing 12” waterline west of Tower Road.
 Proposed improvement within Right-of-Way: One 8” water line with a 16” steel casing boring Tower Road.
 
d. Applicant: North Alamo Water Supply Corporation
 Legal Description: 1.67 acres out of Lot 8 Blk. 118 Campacuas Addition Subdivision (Mile 12 North Road & Mile 2  West Road)
(Pct. 1)
 Location of Pipeline or Utilities: Existing 8” waterline east of Mile 2 West Road.
 Proposed improvement within Right-of-Way: One 3/4” water service line with a 2” PVC casing boring Mile 12 North Road.
 
e. Applicant: North Alamo Water Supply Corporation 
Legal Description: 6.97 acres out of Blk. 134 Hall Fifield Subdivision Proposed; Montiel Subdivision 
(Minnesota Road & Valverde Road) (Pct. 1)
 Location of Pipeline or Utilities: Existing 8” waterline north of Minnesota Road.
 Proposed improvement within Right-of-Way: One 1” dual water service line with a 2” PVC casing boring Minnesota Road.
 
f. Applicant: Sharyland Water Supply Corporation
 Legal Description: 0.50 acre out of Lot 525 John H. Shary Subdivision (Shary Road & Mile 7 ½ North Road) (Pct. 3)
 Location of Pipeline or Utilities: Existing 2” waterline along the west side of Shary Road.
 Proposed improvement within Right-of-Way: One 1” water service line with a 2” PVC casing boring Shary Road.
 
g. Applicant: Spectrum (Project No. 1869084-SM110)
 Proposed location of Power Supply Pole:  East of Bentsen Palm Drive approximately 770.00 feet north of Concepcion Avenue.
(Pct. 3)
 
h. Applicant: Spectrum (Project No. 1869084-SM111)
 Proposed location of Power Supply Pole:  East of Bentsen Palm Drive approximately 100.00 feet south of Maribel Street. (Pct. 3)
 
i. Applicant: Spectrum (Project No. 2159668-WE113)
 Proposed location of Power Supply Pole:  North of Mile 13 North Road approximately 250.00 feet east of Flamingo Road. (Pct. 1)
 
j. Applicant: Spectrum (Project No. 2159668-WE114)
 Proposed location of Power Supply Pole:  North of Mile 13 ½ North Road approximately 150.00 feet west of La Blanca Road. (Pct. 1)

BACKGROUND


Fiscal Impact

Attachments

Form Review

Inbox Reviewed By Date
Budget and Management Veronica Ortiz 09/02/2021 10:19 AM
Final Approval Monica Salinas 09/03/2021 06:56 PM
Form Started By:
Flor Castillo
Started On:
09/02/2021 09:15 AM
Final Approval Date:
09/03/2021