Izaguirre Engineering Group:
1. Install a 6" water line along La Homa Rd and Mile 9 North.
North Alamo Water Supply:
1. Approximately 1506' going west from FM 493 on the south side of Mile 15 1/2N- Line Ext. (La Escondida Acres S/D)
Nain Engineering:
1. Install an 8" water line along Mile 5 North Road and Babb Dr.( Bearden S/D)
North Alamo Water Supply:
1. Balli #2 L40 (493 ES/S Lotts)- Bore- Martina Juares-Relocate 3/4" service connection
2. Heidelberg S/D L172 (NWC 2E/9N)- Bore- Porfirio N. Gomez- 3/4"service connection
3. Capisallo Park L21 B1 (SEC 1E/9N)- Bore- Juan Cervantes Jr- 3/4" service connection
4. Approximately 355' East of Valverde on the north side of Curve Rd- Line Ext.- Juan Hernandez; 3/4" service connection.
Quintanilla, Headley and Associates:
1. Proposes to install a 30" RCP storm drain pipe line 10' south of the north ROW line of mile 17 1/2N Rd. The 30" RCP line will start at the existing drain ditch and then run west 510.0LF to the proposed North San Carlos Estates Phase II S/D.
1. Install a 6" water line along La Homa Rd and Mile 9 North.
North Alamo Water Supply:
1. Approximately 1506' going west from FM 493 on the south side of Mile 15 1/2N- Line Ext. (La Escondida Acres S/D)
Nain Engineering:
1. Install an 8" water line along Mile 5 North Road and Babb Dr.( Bearden S/D)
North Alamo Water Supply:
1. Balli #2 L40 (493 ES/S Lotts)- Bore- Martina Juares-Relocate 3/4" service connection
2. Heidelberg S/D L172 (NWC 2E/9N)- Bore- Porfirio N. Gomez- 3/4"service connection
3. Capisallo Park L21 B1 (SEC 1E/9N)- Bore- Juan Cervantes Jr- 3/4" service connection
4. Approximately 355' East of Valverde on the north side of Curve Rd- Line Ext.- Juan Hernandez; 3/4" service connection.
Quintanilla, Headley and Associates:
1. Proposes to install a 30" RCP storm drain pipe line 10' south of the north ROW line of mile 17 1/2N Rd. The 30" RCP line will start at the existing drain ditch and then run west 510.0LF to the proposed North San Carlos Estates Phase II S/D.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Dina Trevino | 03/06/2008 08:10 AM |
| Rey Salazar | Rey Salazar | 03/07/2008 01:20 PM |
| Auditor's Office | 03/07/2008 05:16 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 03/04/2008 08:56 AM
- Final Approval Date:
- 03/07/2008