AI- 9165
4.A.
CC CONSENT
- Meeting Date:
- 05/13/2008
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
CAPTION
1. El Paso E & P Co.:
-One two(2) inch welded steel pipeline crossing a Hidalgo County road right of way at a point of beginning on the west boundary line of a county road running north and south through the Valley Farm S/D said road bound on the east by Lots 86 and 95 and on the west by Lots 87 and 94 of said subdivision.
2. North Alamo Water Supply:
-Twin Lakes L5 (Davis NS/W Doolittle)- Bore- Guadalupe Martinez-3/4" service connection.
-Approximately 380' west of Cesar Chavez on the north side of Owassa Rd- Relocate- Jose Gonzalez 3/4" service connection.
3. Ramos Industries:
-Proposed 4" sewer line approximately 5' deep across Los Ebanos Rd; we have to cut, can't bore rock area underground.
4. Rio Delta Engineering:
-An 8 inch PVC water line to be encased with 15 inch PVC casing. Crossing to be located approximately 769 ft. East of the intersection of Rio Grand Floral and FM 3250.
-One two(2) inch welded steel pipeline crossing a Hidalgo County road right of way at a point of beginning on the west boundary line of a county road running north and south through the Valley Farm S/D said road bound on the east by Lots 86 and 95 and on the west by Lots 87 and 94 of said subdivision.
2. North Alamo Water Supply:
-Twin Lakes L5 (Davis NS/W Doolittle)- Bore- Guadalupe Martinez-3/4" service connection.
-Approximately 380' west of Cesar Chavez on the north side of Owassa Rd- Relocate- Jose Gonzalez 3/4" service connection.
3. Ramos Industries:
-Proposed 4" sewer line approximately 5' deep across Los Ebanos Rd; we have to cut, can't bore rock area underground.
4. Rio Delta Engineering:
-An 8 inch PVC water line to be encased with 15 inch PVC casing. Crossing to be located approximately 769 ft. East of the intersection of Rio Grand Floral and FM 3250.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Dina Trevino | 05/08/2008 08:09 AM |
| Auditor's Office | bmorales | 05/09/2008 03:44 PM |
| Court Administrator | Alejandro Garcia | 05/09/2008 03:54 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 05/05/2008 02:57 PM
- Final Approval Date:
- 05/09/2008