AI- 9603
6.A.
CC CONSENT
- Meeting Date:
- 06/17/2008
- Submitted For:
- Joe Pena
- Submitted By:
- Sandra Garcia, RIGHT OF WAY DEPT.
- Department:
CAPTION
Quintanilla, Headley & Associates:
1. The contractor proposed to open cut and repair the existing asphalt road for a 30"RCP storm sewer line across Benito Ramirez Road. The bore will be located 25.0' west of Cesar Chavez Road. The 30" line will then run East 652.0' being 5.0' south of the north ROW line of Benito Ramirez to the proposed subdivision.
North Alamo Water Supply:
1. The proposed 8" PVC C-900 Class 100 water line will be installed under the caliche
Mile 10 1/2 North Rd. The line being 1,345.50' East from the intersection of FM 493, then continuing within the ROW of Mile 10 1/2 North Road along the 2' alignment from the North ROW line of said Rd. for a distance of 1350 LF.
2. Approximately 155' from the existing water line on the north side of Vista Bonita Rd west of Brushline Rd. Alejandro Castillo
3. Approximately 500' west of Terry Rd on the north side of Benito Ramirez (Pinkston Rd)Bore- Roel Rios.
4. Approximately 500' east of Doolittle Rd on the north side of Ingle Rd boring the irrigation canal from west to east- Bore- Horacio Vargas.
1. The contractor proposed to open cut and repair the existing asphalt road for a 30"RCP storm sewer line across Benito Ramirez Road. The bore will be located 25.0' west of Cesar Chavez Road. The 30" line will then run East 652.0' being 5.0' south of the north ROW line of Benito Ramirez to the proposed subdivision.
North Alamo Water Supply:
1. The proposed 8" PVC C-900 Class 100 water line will be installed under the caliche
Mile 10 1/2 North Rd. The line being 1,345.50' East from the intersection of FM 493, then continuing within the ROW of Mile 10 1/2 North Road along the 2' alignment from the North ROW line of said Rd. for a distance of 1350 LF.
2. Approximately 155' from the existing water line on the north side of Vista Bonita Rd west of Brushline Rd. Alejandro Castillo
3. Approximately 500' west of Terry Rd on the north side of Benito Ramirez (Pinkston Rd)Bore- Roel Rios.
4. Approximately 500' east of Doolittle Rd on the north side of Ingle Rd boring the irrigation canal from west to east- Bore- Horacio Vargas.
BACKGROUND
Fiscal Impact
Attachments
Form Review
| Inbox | Reviewed By | Date |
|---|---|---|
| Budget and Management | Dina Trevino | 06/09/2008 02:13 PM |
| Auditor's Office | aduran | 06/12/2008 03:58 PM |
| Court Administrator | Alejandro Garcia | 06/12/2008 04:09 PM |
- Form Started By:
- Saul Garcia
- Started On:
- 06/03/2008 08:23 AM
- Final Approval Date:
- 06/12/2008