| AGENDA ITEM #: 9. DATE: 04/26/2021 |
![]() |
CITY COUNCIL ACTION REPORT
| SUBJECT: | PRELIMINARY PLAT FOR ESTRELLA PARCEL 11.I2 |
| STAFF PRESENTER(S): | Alex Lestinsky, Senior Planner |
OTHER PRESENTER(S):
Stuart Barney, Newland Communities
SUMMARY:
Preliminary Plat for Estrella Parcel 11.I2, subdividing approximately 6 acres of property into 23 lots and 1 tract.
Recommendation:
Approve the Preliminary Plat for Estrella Parcel 11.I2, subject to stipulations. (Alex Lestinsky, Senior Planner)
STIPULATIONS:
- Compliance with the stipulations stated in Section 2 of Ordinance No. 2018-1413, the ordinance adopting the Lucero Planned Area Development (PAD) Amendment, dated October, 2018;
- Prior to approval of all final plats platting any portion of the property included in the preliminary plat for Parcel 11.I2 (the “Property”), owner shall demonstrate to the city that adequate potable water resources exist to serve the proposed final plat in the form of Equivalent Dwelling Units (EDU) pursuant to any development agreement with the City. The EDU calculation demonstrating compliance with such agreement shall be placed on the final plat;
- The developer shall provide a waiver agreement for each initial homebuyer to sign, and shall include the following statement in the waiver agreement as well as a similar statement in the Public Sales Report and on the final plat: “Parcel 11.I2 is subject to attendant noise, vibrations, dust, and all other effects that may be caused by overflights and by the operation of aircraft landing at or taking off from Phoenix-Goodyear Airport and Luke Air Force Base. The Owner does release and discharge the City of Goodyear from any liability for any and all claims for future damages and complaints of any kind to persons of property that may arise at any time in the future from the operation of such aircraft near and over the area.”
- Final plats subdividing all or part of the Property shall not be approved unless each final plat provides for secondary access points and a looped water system that meet applicable standards. No final plat subdividing all or part of the Property shall be recorded until all easements and/or right-of-way located outside the boundaries of the portion of the Property included in the final plat being recorded needed for secondary access points and a looped water system have been dedicated to the City of Goodyear, the conveyance documents recorded in the official records of the Maricopa County, and the recording information inserted onto the final plat that is to be recorded. All right-of-way to be dedicated hereunder shall be conveyed to city lien free and in fee. All easements to be dedicated to the city shall be lien free, free of all encumbrances unless agreed to by city staff, and in a form approved by the City Attorney or his designee.
- In addition to the specific dedications identified herein, Owner shall dedicate to the City of Goodyear by separate instrument all easements and right-of-way located outside the boundaries of the Property within which infrastructure needed to provide access and utility services to the Property has to be constructed. This may include, but is not limited to, water easements, sewer easements, public utility easements, access easements, and right-of-way. All right-of-way to be dedicated hereunder shall be conveyed to city lien free and in fee. All easements to be dedicated to the city shall be lien free, free of all encumbrances unless agreed to by city staff, and in a form approved by the City Attorney or this designee. The easements and conveyances referred to herein shall be recorded prior to the recordation of the first final plat subdividing all or part of the Property, and the recording information for the easements and conveyances shall be inserted onto the final plat before it is recorded.
- In addition to constructing the specific infrastructure identified herein Owner shall construct all infrastructure improvements within and outside the boundaries of the Property needed to provide access and utility services to the Property. This may include, but is not limited to, water and wastewater improvement and road improvements.
- Prior to recordation of the first final plat subdividing all or part of the Property, Owner shall, by separate instrument, convey to the City in fee and lien free the real property needed for the construction of the Sendero Sanitary Sewer Lift Station and for providing an access road to the Sendero Lift Station.
- Owner shall be responsible for constructing the Sendero Sanitary Sewer Lift Station prior to or concurrent with the construction of the infrastructure needed to serve the Property, including infrastructure within and outside the boundaries of the Property.
- Prior to recordation of the first final plat subdividing all or part of the Property, financial assurances shall be provided to the city in an amount sufficient to ensure the completion of all of the infrastructure needed to serve the Property, including infrastructure within and outside the boundaries of the Property, which includes, but is not limited to the completion of the Sendero Sanitary Sewer Lift Station.
- Unless dedicated within the first final plat subdividing all or part of the Property, Owner shall, prior to recordation of such first final plat, dedicate to the City by separate instrument: (i) all right of-way needed for the construction of the section of Sendero Drive between Hillside Drive and the West Ardmore Road alignment and (ii) public utility easements along all road right-of-way to be dedicated herein. The easements referred to herein shall be in a form approved by the City Attorney or his designee and the rights-of-way shall be conveyed dedicated lien free and in fee. The easements and conveyances referred to herein shall be recorded prior to the recordation of the first final plat subdividing all or part of the Property, and the recording information for the easements and conveyances shall be inserted onto the final plat before it is recorded.
- Owner shall be responsible for constructing full street improvements, including improvements for wash crossings, pursuant to approved construction plans for the section of Sendero Drive between Hillside Drive and the West Ardmore Road alignment prior to or concurrent with the construction of the infrastructure, within the Property and outside the boundaries of the Property, needed to serve the Property and financial assurances in an amount sufficient to ensure the completion of the Sendero Drive improvements shall be provided to the City prior to the recordation of first final plat subdividing all or part of the Property.
- No building permits shall be issued for vertical construction except for model homes until the Sendero Sanitary Lift Station has been completed and accepted by the City Engineer or his designee subject to the two-year warranty period. No certificates of completion or occupancy shall be issued for any structure within the Property, including model homes, until the Sendero Sanitary Lift Station has been completed and is in service.
- Prior to the issuance of any permit for the construction of improvements that will be located within an area subject to an easement held by Tucson Electric Power (TEP), written approval, in a form acceptable to the City Attorney or his designee, shall be obtained from TEP allowing such work.
- Prior to the issuance of any permit for the construction of improvements that will be located within an area subject to an easement held by Arizona Public Service (APS), written approval, in a form acceptable to the City Attorney or his designee, shall be obtained from APS allowing such work.
- Prior to the issuance of any permit for construction of improvements that will be located within an area subject to an easement held by Salt River Project (SRP), written approval, in a form acceptable to the City Attorney or his designee, shall be obtained from SRP allowing such work
FISCAL IMPACT:
Although a fiscal impact analysis has not been conducted on this specific project, all new development will have an ongoing fiscal impact on the city. The development is responsible for construction of all infrastructure necessary to serve the site and will generate one-time revenue for the city through payment of permits, construction sales tax and development impact fees. Longer term fiscal impacts include increased demands for municipal services, the costs of which may or may not be offset by increased property values/tax levies, city sales tax, state shared revenues and the increased demand for commercial and retail development. Any areas that will be maintained by the city are constructed by the developer and then conveyed to the city two years after construction.
BACKGROUND AND PREVIOUS ACTIONS:
On November 26, 2018, the City Council adopted Ordinance No. 2018-1413 approving the Lucero PAD Amendment. The Lucero PAD Amendment, designates the subject parcel as Low/Medium Density Residential.
This preliminary plat has not been previously presented to the City Council. The Planning and Zoning Commission recommended approval of the preliminary plat (5-0) on April 14, 2021
This preliminary plat has not been previously presented to the City Council. The Planning and Zoning Commission recommended approval of the preliminary plat (5-0) on April 14, 2021
STAFF ANALYSIS
Current Policy:
Prior to subdividing a property, the owner must submit a preliminary plat that demonstrates compliance with public objectives, subdivision design principles and standards, and streets and thoroughfare planning. The preliminary plat also must be accompanied by information demonstrating the adequacy of utilities, open space and other public facilities necessary to serve the site. The preliminary plat presented herein, subject to the satisfaction of the conditions of approval and as discussed below, satisfies the foregoing requirements. An approved preliminary plat shall expire within 12 months from the date of City Council approval unless either a final plat has been submitted for all or part of the property included in the preliminary plat or an extension has been obtained.
Details of the Request:
The request is to subdivide approximately 9.29 acres into 38 lots and 3 tracts. The subdivision will be accessed from Sendero Drive.
Surrounding development includes:
The typical lot within the subdivision will be 47-feet wide and 90-feet deep. As designated in the PAD, minimum setbacks are 18-feet to the front, 5-feet for the sides, and 10-feet for the rear. Lot coverage is 60%. The maximum building height is 30 feet. A specific housing product or homebuilder has yet to be determined.
School Districts:
The subject property is located within the Liberty Elementary School District and the Buckeye Union High School District. Westar Elementary School and Estrella Foothills High School are located approximately 4 miles from Lucero.
Luke Air Force Base and Phoenix Goodyear Airport:
The subject property is located in the vicinity of Luke Air Force Base and the Phoenix Goodyear Airport Traffic Pattern Airspace. A stipulation has been included to require a general note on the final plat to inform the public and homeowners of base and airport operations and the potential for attendant noise and potential over-flights.
Fire Department:
Emergency response times and distances are provided below:
Police Department:
This parcel is located within an existing patrol beat and the current level of service within the patrol beat can accommodate development of the property.
Solid Waste/Recycling:
Solid waste and recycling will be provided by the City of Goodyear.
Water/Wastewater:
Water and wastewater services will be provided by the City of Goodyear.
Streets/Transportation:
The parcel will be accessible by one point of entry off of Sendero Drive. An emergency secondary access easement is proposed on the eastern boundary of the site. All streets within the subdivision will be public and constructed to city standards.
Prior to subdividing a property, the owner must submit a preliminary plat that demonstrates compliance with public objectives, subdivision design principles and standards, and streets and thoroughfare planning. The preliminary plat also must be accompanied by information demonstrating the adequacy of utilities, open space and other public facilities necessary to serve the site. The preliminary plat presented herein, subject to the satisfaction of the conditions of approval and as discussed below, satisfies the foregoing requirements. An approved preliminary plat shall expire within 12 months from the date of City Council approval unless either a final plat has been submitted for all or part of the property included in the preliminary plat or an extension has been obtained.
Details of the Request:
The request is to subdivide approximately 9.29 acres into 38 lots and 3 tracts. The subdivision will be accessed from Sendero Drive.
Surrounding development includes:
- North – Sendero Dr. and Parcel 11.I1
- East – Tucson Electric Power (TEP) and SRP Easements; Parcel 11.H
- South – Open Space
- West – King Ranch property
The typical lot within the subdivision will be 47-feet wide and 90-feet deep. As designated in the PAD, minimum setbacks are 18-feet to the front, 5-feet for the sides, and 10-feet for the rear. Lot coverage is 60%. The maximum building height is 30 feet. A specific housing product or homebuilder has yet to be determined.
School Districts:
The subject property is located within the Liberty Elementary School District and the Buckeye Union High School District. Westar Elementary School and Estrella Foothills High School are located approximately 4 miles from Lucero.
Luke Air Force Base and Phoenix Goodyear Airport:
The subject property is located in the vicinity of Luke Air Force Base and the Phoenix Goodyear Airport Traffic Pattern Airspace. A stipulation has been included to require a general note on the final plat to inform the public and homeowners of base and airport operations and the potential for attendant noise and potential over-flights.
Fire Department:
Emergency response times and distances are provided below:
| Nearest Goodyear Fire Station | Shortest path | Longest path | 2nd nearest Fire Station | Shortest path | Longest path | ||||
| Mins | Miles | Mins | Miles | Mins | Miles | Mins | Miles | ||
| #182 | 4.29 | 2.14 | 4.91 | 2.45 | #184/181 | 12.11 | 6.05 | 12.73 | 6.36 |
Police Department:
This parcel is located within an existing patrol beat and the current level of service within the patrol beat can accommodate development of the property.
Solid Waste/Recycling:
Solid waste and recycling will be provided by the City of Goodyear.
Water/Wastewater:
Water and wastewater services will be provided by the City of Goodyear.
Streets/Transportation:
The parcel will be accessible by one point of entry off of Sendero Drive. An emergency secondary access easement is proposed on the eastern boundary of the site. All streets within the subdivision will be public and constructed to city standards.