- Title:
- 1710-194-Neenah Avenue Widening Change Order No. 2
- Submitted By:
- Dawn Haggard, Road Bond
- Department:
- Road Bond
- Agenda Category:
- Regular Agenda Items
Information
Agenda Item
Discuss, consider, and take appropriate action regarding Change Order No. 2 in the amount of $4,362.51 for Neenah Avenue Widening (Smith Contracting Co.), a Road Bond project in Commissioner Pct. 1. Project: P278. Funding Source: Road Bond.
Background
This Change Order compensates the contractor for additional costs to remove and reset formwork on a portion of the shared use path (SUP) due to a grade change per the Engineer’s response to RFI #10 and for upgrading the strength of the concrete used in the driveways to reduce the time that the church and the school are without their driveways. The Contractor had a small section of the proposed SUP formed to the planned grades but was required to remove and re-set the formwork to correct a drainage issue that was identified prior to the concrete pour. The Contractor was requested to upgrade to a stronger class of concrete for driveway reconstruction to shorten cure times which would minimize the inconvenience to the Catholic Church by reducing the time they would be without use of their driveways.
Fiscal Impact
| From/To |
Acct No. |
Description |
Amount |
Attachments
Form Review
| Inbox |
Reviewed By |
Date |
| County Judge Exec Asst. |
Wendy Coco |
08/02/2018 11:13 AM |
- Form Started By:
- dhaggard
- Started On:
- 08/01/2018 04:59 PM
- Final Approval Date:
- 08/02/2018